Incremental capacity process in 2019

In accordance with the Article 26 of the NC CAM, NET4GAS and the adjacent transmission system operators have given network users the option to submit non-binding indicative bids with the aim of quantifying the potential demand for incremental capacity.

Based on the demand from network users, the transmission system operators have prepared the joint market assessment reports on the potential need for incremental capacity and indicating whether or not the relevant incremental capacity project will be launched in 2019.

In line with the NC CAM, the transmission system operators on each side of the entry-exit system will prepare further joint market assessment reports no later than eight weeks after the beginning of the annual capacity auction in 2021.

Downloads: Market demand assessment reports from 2019