image

Consultation on the draft exemption from enabling bi-directional capacity at the Cieszyn interconnection point

Consultation on the draft request for exemption from the obligation to enable bi-directional capacity at the Cieszyn interconnection point on the border between the Czech Republic and Poland 

Pursuant to the provision under paragraph 2 of Annex III of Regulation (EU) 2017/1938 of the European Parliament and of the Council, of 25 October 2017 (the "SoS Regulation"), NET4GAS and GAZ-SYSTEM are today launching a consultation with the potentially concerned transmission system operators. 

Both above-mentioned companies have prepared a joint draft request for granting an exemption from the obligation to enable permanent physical bi-directional capacity at the Cieszyn interconnection point. This document is available here.  

Transmission system operators potentially concerned by this request may submit their comments no later than 6 November 2023 to following email address:  exemption@net4gas.cz.  The comments must be duly justified and accompanied by contact details (name, address, e-mail, telephone number).